The added challenge was that there was no additional plot space available on the platform and tie‐in points were limited.

Jord undertook a full design and performance assessment and designed a solution that removed the axial flow cyclone, installed a multi‐cyclone between the production separator and the compressor suction scrubber and cantilevered the additional multi cyclone vessel off the platform structure.

Wax removed, zero sand carryover and the design gas flow was restored

Capital cost was minimized through utilization of the existing vessels, and plot space constraints were overcome

The performance, reliability and integrity of the compressor was restored

Disruption to platform production was minimized and client achieved maximized return on investment