Jord’s scope for this project comprised process and mechanical design, including comprehensive finite element, structural, vibrational and noise analysis. Procurement, manufacture, performance testing and delivery to site.

Jord delivered 71 air cooler bays, measuring 16m (L) x 6m (W), and weighing up to 70 tons, in a fully assembled condition to Woodside’s LNG Train IV plant. The units featured a custom designed, high performance, robust fan drive bearing system to withstand the rigorous demands of this service. Three ships were charted to transport the units direct from Korea to site.